Transporting large components with AGVs
The challenge: Our customer's loaded transport racks weigh more than 1.5 tons and are twice as long as the AGV used to move them. The size and weight...
BEC participated in this year's Tomorrow Labs in Magdeburg as a partner of the Stimulate research campus. Our robot assistance system guidoo was in use in Warehouse A of the Port of Science. Outside, our BEC Robot Coaster was ready to take visitors to lofty heights. A really great event!
The challenge: Our customer's loaded transport racks weigh more than 1.5 tons and are twice as long as the AGV used to move them. The size and weight...
BEC participated in this year's Tomorrow Labs in Magdeburg as a partner of the Stimulate research campus. Our robot assistance system guidoo was in...